Tiles at Forum Mall forced walkers onto the road. BBMP removed them.
At Forum Mall, Bengaluru civic officials removed tiled sections to restore pedestrian access, clearing about three metres on both sides of the entrance. Separately, B-Smile has put forward a split-type flyover at Konanakunte Cross, featuring elevated stretches of roughly 600 metres per side, with an estimated cost of Rs 77 crore.
Key points
- On Saturday, Bengaluru South City Corporation officials removed the tiles along the mall frontage to restore pedestrian access.
Why it matters
The practical property angle is connectivity, project timelines, and the property pockets that may see changed demand.
Read the full report on Times of India Bengaluru.





