Ahmedabad Metro airport station's fans can take 250°C heat. Here's why.
Ahmedabad Metro's underground airport station is slated to open by 2029, with trains every 12 minutes. The 6.32 km route from Koteshwar Road includes four elevated stations and an underground airport stop. Design features include 27°C platforms, full-height screen doors, and fire-resistant ventilation fans rated for 250°C, plus underground shopping and cafes.
Key points
- Ahmedabad Metro's underground airport station is planned to start operations by 2029.
- The station is part of a 6.32 km route from Koteshwar Road to the airport, with four elevated stations.
- Initially, 3-coach trains will run every 12 minutes; design allows for future 6-coach trains.
Why it matters
The practical property angle is connectivity, project timelines, and the property pockets that may see changed demand.
Read the full report on Divya Bhaskar Ahmedabad.





