Bullet train to run through a 12-storey-high bridge and undersea tunnel
India's first bullet train, the Mumbai-Ahmedabad High-Speed Rail, is targeting an August 15, 2027 launch. The 508-km corridor will feature an undersea tunnel under Thane Creek and a 12-storey-high bridge over the Sabarmati River. On November 20, 2026, the Surat-Bilimora section's overhead electrical system will be energised.
Key points
- Mumbai-Ahmedabad High-Speed Rail (MAHSR) is 508 km long, with 12 stations from Mumbai to Sabarmati.
- Japanese Shinkansen technology will be used, with a maximum planned speed of 320 kmph and initial operational speed of 250 kmph.
- A 21-km underground tunnel in Maharashtra includes about 7 km under Thane Creek, India's first undersea rail tunnel.
Why it matters
The practical property angle is connectivity, project timelines, and the property pockets that may see changed demand.
Read the full report on Jagran Josh.




