PROPSHORT

₹6,027.58 crore elevated corridor: Thane to Navi Mumbai airport in 30 min

Source: Inshorts ·

Picture chosen by PropShort, not the publisher’s. Image credits

CIDCO seeks bids for a ₹6,027.58 crore toll-funded elevated highway linking Thane to Navi Mumbai International Airport. The 25.287km six-lane route aims to slash travel duration from over 90 minutes to under 30 minutes within three years of contractor appointment.

Key points

Why it matters

The practical property angle is connectivity, project timelines, and the property pockets that may see changed demand.

Read the full report on Inshorts.