PROPSHORT

18.5-km Bengaluru elevated road is planned over water mains. BWSSB says it has no records of it.

Source: The Hindu Bengaluru ·

Picture chosen by PropShort, not the publisher’s. Image credits

The 18.5-km Ragigudda-Kanakapura elevated corridor has not received BWSSB approval or an NOC, as per the Board's October 29 RTI reply to a September 18 application. Citing missing feasibility documents and pipeline safety concerns, BWSSB holds no technical records. Residents fear four major water mains along the route may be endangered.

Key points

Why it matters

The practical property angle is connectivity, project timelines, and the property pockets that may see changed demand.

Read the full report on The Hindu Bengaluru.